What's shipping today, what's funded next, and where the Luminaria family is going. Updated as the roadmap evolves — previous versions live in Git history. Honest framing throughout: we don't list anything we don't intend to ship.
Claude Code (JSONL), Claude.ai (ZIP), Claude Desktop / claude.ai (MCP). 4 importers in production, deduplicated and merge-idempotent.
Mistral embeddings on Neo4j vector index, full-text fallback, cross-session graph depth, freshness weighting. 12 MCP tools live in Claude.
Every Cypher query starts with MATCH (t:Tenant). Automated lint blocks any non-isolated query from merging. 1,800+ tests across the codebase.
CREATE-only writes on Activity Atoms. No UPDATE paths in code. Foundation for hash-chained tamper-evidence (funded buildout).
Compute (Clever Cloud Paris), database (Neo4j Aura europe-west1), AI inference (Mistral Paris), auth (Supabase Frankfurt). Not policy — by code.
Live subscription billing with grace periods, plan downgrades, plan-tiered retention (14d Pro, 90d Business), webhook-driven enforcement.
Funded buildout — every item below is dependent on Stellari Studio's funding pipeline closing. Dates are best estimates and will shift as funding lands.
Sub-processor migration to fully-EU stack (payments → Mollie, email → EU-resident provider). ISO 27001 gap analysis kicks off. Public sub-processor register deployed at /sub-processors.
Tamper-evident hash chain over append-only log. Public verification endpoint. AI Act Article 12 mapping document published.
External audit. Statement of Applicability published. SOC 2 Type I prep begins.
Trust services criteria audit. First enterprise contracts with full DPA + SCC pack. Customer-managed encryption keys (BYOK) shipped for Enterprise tier.
Article 12 conformity assessment certified by notified body. Public pen test programme launches. Annual external pen test cadence established.
Continuous monitoring audit. Bug bounty programme public. 99.95% uptime SLA contractual. Cross-region DR with RPO < 15 min.
Nine quarters of product work, from Q2 2026 through Q2 2028. Items tagged [EIC] depend on EIC Accelerator funding closing; items tagged [ELIAS] depend on ELIAS Open Call funding. Untagged items are self-funded from Memo revenue.
Memo is the anchor. Kirby, Calendar, and Forms are bootstrapped from Memo revenue post-funding. All four share the same EU stack: single Neo4j graph, Mollie payments, Supabase auth, Vercel EU edge.
AI session capture and retrieval for Claude Code, Desktop, claude.ai. 12 MCP tools live in Claude. Live at luminaria.so.
EU-sovereign alternative to Linktree / Beacons. Build a single landing page with multiple links, sell digital products natively, embed Forms and Calendar without third-party integrations.
Cal.com / Calendly alternative. Connect Google / iCal / Outlook. Accept paid bookings via Mollie. Embed in Kirby pages. JSON export anytime.
Tally / Typeform alternative. EU-resident submissions, conditional logic, paid forms via Mollie, embed in Kirby pages. GDPR-compliant by default.
Quarters are realistic targets, not contractual commitments. We update this page as the roadmap evolves; previous versions live in Git history.
Anything in the funded buildout requires the funding pipeline to close. Until then, those items are intent, not commitment. We won't claim them as shipping.
We commit to what's listed and resist scope creep on principle. If something gets cut, this page gets updated and the cut is noted in Git history.
This roadmap lives in our public repo. Every change is timestamped via Git commits — the commit history IS the change log.
We don't list things we don't intend to ship. We don't backfill commitments after they slip. If something gets cut, this page gets updated and the cut is noted.
EIC / ELIAS / EU funder evaluators: this is the same roadmap referenced in our applications. Compliance dates align with Step 2 budgets.
The fastest way to understand the roadmap is to use the live product. The future is everything you don't yet have.